New Production Site in Poland for Pet Food

Factory Planning, Supply Chain, General Planning

Construction of an Additional Facility to Serve the Market

The Customer is a medium-sized manufacturer of premium pet food who is looking to expand into the production of wet pet food. Due to increased market demand following the COVID-19 pandemic, the company decided to invest in a new production facility for dog and cat wet food in cans.

A comprehensive comparison of countries and regions identified eastern Germany and western Poland as the most attractive and economical options. A detailed regional analysis of wage levels, transportation, utility and waste infrastructure, and proximity to key suppliers ultimately led to the decision for a site in western Poland. Metroplan supported the client in the strategic site search, including the selection of suitable properties, detailed technical due diligence, and assistance with the entire purchase process.

In parallel, funding opportunities were explored, with Metroplan assisting the client in calculating and applying for grants and drafting the funding application. After successfully acquiring the land through a closed auction, comprehensive foundational investigations and analyses of process-specific user requirements were conducted. An integrated factory and building plan, from concept and design to permitting planning, was developed.

The next phase included tendering construction services, machinery, and equipment. Metroplan also coordinated the award process, developed award recommendations, and documented the entire procedure. The planning was continuously monitored to ensure successful project execution.

Branche

Consumer and Food

Products

Pet Food

Service

Site Selection, Factory- and Generalplanning

Dimension

15.000m²

Project focus and services

State funding

Footprint Design

Further references
General Planning, Supply Chain
Automotive

Construction of a Modern Catalyst Factory in Poland

After selecting the location, Metroplan provided comprehensive support with the application for EU funding, land acquisition, and joining the Walbrzych special economic zone. Metroplan also handled the complete planning of the logistics warehouse, including permitting planning. Subsequently, we prepared the construction tender, obtained offers, and supported the award process.

To reference
Construction of a Modern Catalyst Factory in Poland
Supply Chain, General Planning
Electrical Engineering

Planning of an Electronics Production Facility in Debrecen

Metroplan accompanied the project from the beginning, developing a comprehensive requirement catalog and the block layout for the two-story new building. In planning internal material flows and production processes, all relevant factors were carefully considered, including the optimal arrangement of workplaces, process flows, and storage systems.

To reference
Planning of an Electronics Production Facility in Debrecen
General Planning, Factory Planning
Chemicals

Future-Oriented Site Development for the Production of Hygiene Solutions

Factory and Facility Planning for the Strategic Site Development of a Provider of Hygiene Solutions.

To reference
Future-Oriented Site Development for the Production of Hygiene Solutions
Scroll to top