- Optimisation of commissioning and packing
Development of different approaches to optimisation and concept alternatives under consideration of a profitable degree of automation.
Company size: 600 employees
- Factory concept for a new factory building
Factory planning and process design for a life sciences production
Company size: 3,300 employees
Dimension: Planning of a production on 1,300 m²
- Feasibility study | Logistics centre extension
Feasibility study of a warehouse extension – Conception of three different extension solutions with individual inhouse supply concepts.
Company size: ~ 10,000 employees
Dimension: Automatic mini-load extension: approx. 40,000 cardboard squares
- Production and logistics optimisation
Production optimisation to reduce scrap rates, optimisation of logistics processes to stabilise shipping output
Company size: 300 employees
- Deep-freeze high bay warehouse
Tender for a deep-freeze HBW for finished goods, with automatic connection to dispatch and automated mixed pallet formation
Dimension: 10,000 pallet spaces in frozen storage 3 double-deep aisles
- Masterplan
Master planning for the maximum expansion of the plant and concept planning green field “new chocolate factory”
Company size: 1,500 employees
Dimension: 20,000 m²
- Optimisation | Warehouse logistics
Review current warehousing process and capacity limitations as well as highlight quick wins. Develope of a new warehouse concept for 2030 requirements for the UK business.
Company size: > 9,418 employees
- General contractor tender
Final planning and tendering of an ideal logistics concept (channel storage system & narrow-aisle warehouse) for the handling of finished goods and articles of trade at the future production site
Company size: > 220 employees
Dimension: Logistics area: approx. 7,000 m²
- Warehouse | Off-price
Planning as well as tendering and awarding of the conveyor technology and the WMS for the new location
Company size: > 15,600 employees
Dimension: 20,000 m²
- Feasibility study | Brown field
Development and valuation of multiple brownfield central warehouse concepts under the consideration of the existing property and the available adjoining land
Company size: about 700 employees
Dimension: 57,000 m²
- Logistics concept | France
Conception, planning and tendering of the storage systems as well as workstations for picking and packaging of customer orders at the logistics location in France
Company size: 3,300 employees
- Distribution Centre | Europe1
Conception, planning, tendering and realisation of a distribution centre for Europe-wide customer supply
Company size: 3,300 employees
Dimension: 17,000 m²; 40,000 Pal.
- Case and pallet picking
Conception of an automated picking system for customer orders (case single/layer pick, quarter pallets, full pallets)
Company size: about 30,100 employees
- Production supply concept
Detailed planning, tendering, implementation support and acceptance of the production supply and disposal concept as part of the expansion of the finished goods production
Company size: > 9,418 employees
- Phenomena analysis
Efficiency enhancement project with a comprehensive analysis and possible optimisation of the entire warehouse and process landscape of the german warehouse
Company size: > 12,000 employees
Dimension: 38 Countries in Europe
- Logistics concept 2017+
Merge and harmonise the logistic requirements of two companies into one centralised and sustainable warehouse
Company size: > 700 employees
Dimension: ~ 50,000 m²
- Masterplan
In order to secure the expansion of logistics for the future, Metroplan 2015 was commissioned with the master planning study
Company size: > 2,000 employees
Dimension: 12,000 PP TK HBW
- Conveying and palletising study
Study for optimisation of high-speed production and palletizing lines for FMCG products in cooperation with leading european MHE suppliers
Company size: about 135,000 employees
Dimension: Production site > 70,000m²
- Re-engineering | Storage system and pick to light system
Recording and analysis of existing storage and conveying systems along with determination of future requirements
Company size: about 135,000 employees
Dimension: ~ 3,000 m²
- Re-Engineering | Warehouse strategy
Recommendation for gradual reengineering of the transport and palletising system
Company size: about 135,000 employees
Dimension: ~3,000 m²
- Re-engineering | Plant logistics
Revision of the material handling connection of the production to the works warehouse along with reorganization of the warehouse technology in the works warehouse
Company size: 83,000 employees
- Modernisation | Logistics centre
Vulnerability analysis of the existing conveyor system as well as optimisation of the identified bottlenecks during ongoing operation.
Company size: 900 employees
Dimension: ~ 2,000 m²
Other services



Industry 4.0 / Digitisation supply chain

Distribution &
network studies

Warehouse &
material flow concept


Warehouse optimisation
& modernisation

Location analysis &
selection


Process/