Production logistics

References
- Optimisation of the intralogistics concept
Reorganisation of the existing line supply concept with the aim of reducing operating costs
Company size: 7.000 employees
Dimension: ~ 500 m², 15 meters high, 300 SKU
- Site optimisation
Optimisation of site logistics to supply the production areas
Company size: 12,000 employees
- Factory concept | Angled mirrors
Development of a concept for brownfield reorganization and integration of a planned building extension
Company size: 110 employees
Dimension: 10,000m² floorspace
- Intralogistics concept | FMCG
Development of an intralogistics-system for a planned production site
Company size: 1,800 employees
- Factory planning | Electrical engineering
Planning and realisation of battery assemblies, planning layout and material flow and implementation support for the new building of the cell production at the Greek site
Company size: 630 employees
Dimension: 2 assembly plants
- New production site | Bulgaria
Planning and design of the production supply, the warehouse and the logistic functions for the new site
Company size: about 5,100 employees
Dimension: 12,400 m²
- Intralogistics concept | Automotive
Development of a holistic intralogistics concept with focus on the integration of a planned extension into the existing factory structure
Company size: about 9,700 employees
Dimension: 40,000 m²
- Logistics concept
Development of a future logistics concept for the German production site considering efficient bearing technologies and ideal material flow systems
Company size: about 220 employees
Dimension: 3,000 m² net floor area
- Planning and optimisation | Intralogistics
Design process for materials handling between production stages and conception of a proper technical solution
Company size: about 1,296 employees
Dimension: 8,000 m²
- Lean logistics
Development of a concept layout for the production plant in Czech required due to short term integration of new products
Company size: 1,450 employees
Dimension: ~12,500 m²
- Flow-orientated production line design
Structure planning for the new factory for the drive department in Germany
Company size: about 4,100 employees
Dimension: 9,100 m² net floor area
- Implementation | Pull-control
Design and implementation of a levelled production planning and scheduling system based on pull
Company size: about 1,300 employees
- Planning a tugger train system
Design and test run of a periodic production supply realised with tugger trains also for bulky items and connection
Company size: about 1,300 employees
- Material flow orientated production line design
Design of product orientated layout variants for reducing the way of transports
Company size: > 18,600 employees
Dimension: 60,000 m² production area
- Value stream design
Reducing cycle times and creating transparency on the shop floor
Company size: > 140 employees
- Green field factory and logistics centre
concept of the new production plant for milking technology components along with planning of the production and logistics areas
Company size: > 20,000 employees
Dimension: 30,000 m²
- Capacity expansion | Production
Review of the production concept and optimization of the material flow as part of the capacity expansion of the Rheine facility
Company size: > 9,418 employees
Dimension: > 6,000 m²
Other services



Industry 4.0 -
Digitalisation/
supply chain

Distribution &
network studies

Warehouse &
material flow concept


Warehouse optimisation
& modernisation

Location analysis &
selection


Process/
purchasing optimisation