Construction planning
![](fileadmin/_processed_/8/5/csm_18-Bauplanung-0819_01_ae45167a27.jpg)
References
- Development of a recovery plan and integrated planning
Development of a recovery plan to level out timing discrepancies between planned and emerging realization time, and assumption of the resulting project management.
Company size: around 80,900 employees
- Master plan, preliminary, design and approval planning
Development of a master plan for the strategic plant orientation as well as coordination and control of the downstream (preliminary) design and approval planning.
Company size: ~100 employees
- Brown- & Greenfield plant structure planning and location search
Layout concept for the extension of an existing site as well as for a greenfield solution incl. location search for the new building
Company size: 1,900 employees
Dimension: approx. 70,000 m²
- Production relocation | New construction Hungary
Production relocation of electricity and gas meter production from Western Europe to Hungary
Company size: 6,000 employees
Dimension: 17,000 m² of production and logistics space
- Re-Engineering | Production supply
Reengineering of the production supply strategies at the production sites for fragrances in Germany and UK
Company size: about 135,000 employees
Dimension: > 25,000 and 10,000 m²
- Planning and implementation | Shipping centre
General planning for building and technical building equipment Trades as well as pallet shelving systems with functional tendering and allocation to a general contractor construction
Company size: about 150 employees
Dimension: ~ 10,000 m²
- Planning and realisation | Logistics centre
Creation of a logistics concept for the logistics centre along with conception and realisation of the storage areas for finished goods and raw materials
Company size: about 1,000 employees
Dimension: 8,750 m² outside areas
- Re-Engineering | Distribution centre
Re-engineering and expansion of the materials handling technology for the distribution center
Company size: > 11,000 employees
Dimension: 230,000 m²
- Planning and realisation | Distribution centre
Planning and realisation of the new distribution centre for one customer of the world's leading logistics companies
Company size: about 3,470 employees
Dimension: logistics area 27,000 m²
- Modernisation | Logistics centre
Vulnerability analysis of the existing conveyor system as well as optimisation of the identified bottlenecks during ongoing operation.
Company size: 900 employees
Dimension: ~ 2,000 m²
- Modernisation | Distribution centre
Risk analysis of the safety system and support in the tendering process for IT and materials handling
Company size: > 840 employees
- Design and realisation | Logistics centre
Conception and realisation of the logistics centre along with the coordination of the technical suppliers
Company size: > 9,500 employees
Dimension: Automatic mini-load system with 77,500 storage locations for cartons of various dimensions. 18 stacker cranes (turnover of up to 6,000 cartons/h)
Other services
![](fileadmin/_processed_/a/b/csm_09-Fabrikplanung-0819_64169384d8.jpg)
![](fileadmin/_processed_/5/6/csm_10-Fabrikoptimierung-0819_65db1305f7.jpg)
![](fileadmin/_processed_/c/f/csm_11-Produktionslogistik-0819_01_b2191dc315.jpg)
Industry 4.0 / Digitisation supply chain
![](fileadmin/_processed_/0/3/csm_12-Digitalisierung-Industrie-4.0-Supply_Chain-0819_01_9d84175921.jpg)
Distribution &
network studies
![](fileadmin/_processed_/e/2/csm_13-Distributions--und-Netzwerkstudien-0819_9e0bb57a88.jpg)
Warehouse &
material flow concept
![](fileadmin/_processed_/a/6/csm_14-Lager-und-Materialflusskonzeption-0819_661668b1d8.jpg)
![](fileadmin/_processed_/4/1/csm_15-Lagerrealisierung-0819_8b85ff6118.jpg)
Warehouse optimisation
& modernisation
![](fileadmin/_processed_/f/5/csm_18-Bauplanung-0819_2ddd8fa8e5.jpg)
Location analysis &
selection
![](fileadmin/_processed_/e/2/csm_13-Distributions--und-Netzwerkstudien-0819_05816d8d3d.jpg)
![](fileadmin/_processed_/a/6/csm_14-Lager-und-Materialflusskonzeption-0819_39f99b850f.jpg)
Process/
purchasing optimisation
![](fileadmin/_processed_/c/2/csm_20-Prozess-Einkaufsoptimierung-0819_489a2957a7.jpg)