Construction planning
References
- Development of a recovery plan and integrated planning
Development of a recovery plan to level out timing discrepancies between planned and emerging realization time, and assumption of the resulting project management.
Company size: around 80,900 employees
- Master plan, preliminary, design and approval planning
Development of a master plan for the strategic plant orientation as well as coordination and control of the downstream (preliminary) design and approval planning.
Company size: ~100 employees
- Brown- & Greenfield plant structure planning and location search
Layout concept for the extension of an existing site as well as for a greenfield solution incl. location search for the new building
Company size: 1,900 employees
Dimension: approx. 70,000 m²
- Production relocation | New construction Hungary
Production relocation of electricity and gas meter production from Western Europe to Hungary
Company size: 6,000 employees
Dimension: 17,000 m² of production and logistics space
- Re-Engineering | Production supply
Reengineering of the production supply strategies at the production sites for fragrances in Germany and UK
Company size: about 135,000 employees
Dimension: > 25,000 and 10,000 m²
- Planning and implementation | Shipping centre
General planning for building and technical building equipment Trades as well as pallet shelving systems with functional tendering and allocation to a general contractor construction
Company size: about 150 employees
Dimension: ~ 10,000 m²
- Planning and realisation | Logistics centre
Creation of a logistics concept for the logistics centre along with conception and realisation of the storage areas for finished goods and raw materials
Company size: about 1,000 employees
Dimension: 8,750 m² outside areas
- Re-Engineering | Distribution centre
Re-engineering and expansion of the materials handling technology for the distribution center
Company size: > 11,000 employees
Dimension: 230,000 m²
- Planning and realisation | Distribution centre
Planning and realisation of the new distribution centre for one customer of the world's leading logistics companies
Company size: about 3,470 employees
Dimension: logistics area 27,000 m²
- Modernisation | Logistics centre
Vulnerability analysis of the existing conveyor system as well as optimisation of the identified bottlenecks during ongoing operation.
Company size: 900 employees
Dimension: ~ 2,000 m²
- Modernisation | Distribution centre
Risk analysis of the safety system and support in the tendering process for IT and materials handling
Company size: > 840 employees
- Design and realisation | Logistics centre
Conception and realisation of the logistics centre along with the coordination of the technical suppliers
Company size: > 9,500 employees
Dimension: Automatic mini-load system with 77,500 storage locations for cartons of various dimensions. 18 stacker cranes (turnover of up to 6,000 cartons/h)