Automotive
References
- Factory planning
- Factory optimisation
- Production logistics
- Industry 4.0 / Digitisation supply chain
- Distribution & network studies
- Warehouse and material flow concept
- Warehouse realisation
- Warehouse optimisation and modernisation
- Location analysis & selection
- Construction planning
- Tendering
- Process/ purchasing optimisation
- Feasibility study of a new factory concept
Creation of a concept for a new production site in North Rhine-Westphalia.
Company size: around 175 employees
Dimension: approx. 10,000 m² hall area
- Development of an intralogistics concept
Development of an intralogistics concept to stabilise security of supply and reduce RTD.
Company size: 37,500 employees
- Master planning
Master planning for the existing site in two scenarios focused on intralogistics optimisation.
Company size: > 900 employees
- Development of a postponement-strategy
Develop a postponement-strategy to move the point of product customisation (final packaging) to the end of the supply chain and verifying make-or-buy-scenarios.
Company size: 16,400 employees
- Optimisation of the intralogistics concept
Reorganisation of the existing line supply concept with the aim of reducing operating costs
Company size: 4,500 employees
Dimension: approx. 15,000 m²
- Site analysis (DE and PL) and decision template
Operation Footprint scenarios for a JIT supply of an OEM in the Berlin/ Brandenburg area
Company size: 6,000 employees
Dimension: approx. 15,000 m²
- Masterplan | R&D
Structuring of development areas and location selection
Company size: 10,000 employees
Dimension: 70,000 m² usable floor space
- Factory planning and site reorganisation
Reorganisation of a production site with integration of a tech centre
Company size: 400 employees
Dimension: 70,000 m² NIA
- Network optimisation | Automotive
Optimisation of the distribution structure in new and spare part business for EMEA making use of a digital twin
Company size: 16,000 employees
- Test centre | Feasibility study and concept design
Finalise concept layout of a new test facility centre in UK with investigation and validation on requirements of the technical building
Company size: about 149,000 employees
Dimension: 12,500 m² NGF (GF, FF)
- Process optimisation | Automotive supplier
Process optimisation of planning processes and material flow
Company size: 420 employees
Dimension: 100,000 m²
- Phenomena analysis
Efficiency enhancement project with a comprehensive analysis and possible optimisation of the entire warehouse and process landscape of the german warehouse
Company size: > 12,000 employees
Dimension: 38 Countries in Europe
- 3PL logistics tender | Automotive
Execution of a 3PL logistics tender for warehousing, shuttle transport along with logistics manufacturing and distribution in Poland
Company size: > 3,000 employees
- New production site | Bulgaria
Planning and design of the production supply, the warehouse and the logistic functions for the new site
Company size: about 5,100 employees
Dimension: 12,400 m²
- Intralogistics concept | Automotive
Development of a holistic intralogistics concept with focus on the integration of a planned extension into the existing factory structure
Company size: about 9,700 employees
Dimension: 40,000 m²
- Green field factory concept | Freight forwarding
Developing a greenfield factory concept for the truck tyre and wheel assembly production
Company size: about 170 employees
Dimension: floor area 24,850 m²; invest. 25-30 m. €
- Lean logistics
Development of a concept layout for the production plant in Czech required due to short term integration of new products
Company size: 1,450 employees
Dimension: ~12,500 m²
- Plant structure planning 2025
Factory structure planning for the four plants in Germany, with the aim of enabling the implementation of the long-term corporate strategy
Company size: about 149,000 employees
Dimension: 700,000 m²
- Plant development plan | Werk IV
Structure planning for the test facility divisions of the research and development department
Company size: about 149,000 employees
Dimension: 85,000 m²
- Plant development plan | Werk I
Site structure planning for the truck, special drive and marine gearbox in Baden-Württemberg
Company size: about 149,000 employees
Dimension: 243,000 m²
- Plant development plan | Werk II
Factory structure planning for the truck-transmission plant for all work areas in Baden-Württemberg with the aim of the short-, medium- and long-term business development
Company size: about 149,000 employees
Dimension: 286,000 m² gross floor area
- New R&D test centre
Concept planning for a test building of the research and development department in Baden-Württemberg
Company size: about 149,000 employees
Dimension: 24,000 m²
- New surface treatment plant
General planning for the two-storey building of an electroplating in an innovative zinc-nickel process
Company size: about 5,100 employees
Dimension: 4,000 m²
- New production site | China
Planning of a production facility (pilot area) in the site of the Chinese joint venture partner solang with Support for building planning
Company size: about 5,100 employees
Dimension: 10 Million €
- Green field factory | China
Design of a new plant in China along with support of the customer project team
Company size: about 92,478 employees
- Plant development plan | Automotive & carbide technology
Factory structure planning for the German site with five independent subsidiaries
Company size: > 800 employees
Dimension: 60,000 m² production area
- Factory concept planning | Automotive supplier
Workshop-based concept planning for the integration of a remanning center for turbochargers in an existing building
Company size: > 300 employees
Dimension: ~ 3,000 m²
- Value stream design
Reducing cycle times and creating transparency on the shop floor
Company size: > 140 employees
- Overall management | Production setup
From site analysis to overall project management for the production setup and the factory concept including general planning
Company size: about 5,100 employees
Dimension: > 14,500 m²
- New construction of a plant
From the feasibility study, site analysis over the entire planning and conception up to the realisation controlling
Company size: 7.09 billion revenue
Dimension: > 4,500 m²